Dholera solar park is a 5GW solar power project being developed in two phases in Dholera village, approximately 80km from Ahmedabad, Gujarat, India.
Gujarat Urja Nigam Limited (GUVN) has been developing the project through public-private partnership (PPP).
The company is working with Gujarat Power Corporation (GPCL), Gujarat Electric Transmission Corporation (GETCO), Solar Energy Corporation (SECI) and Power Grid Corporation of India (POWERGRID) for the implementation of the project.
The first 1GW-phase is being developed with an investment of Rs5bn ($695m) by GPCL, while the second 4GW-phase will be developed by SECI with an estimated investment of Rs20bn ($2.7bn).
The solar park is a part of the government’s plan for establishing India’s first world-class greenfield Dholera smart city project announced in 2009. It also supports the government’s aim to produce 175GW of clean energy by 2022.
The Ministry of New and Renewable Energy approved the project in May 2018, while conditional approval for the first phase of development was received in February 2019.
Dholera Solar Park loaction :
Dholera solar park will be located at a Coastal Regulation Zone (CRZ) type 1B land within the Dholera Special Investment Region (DSIR), situated along the Gulf of Khambhat region, Gujarat.
Spanning 920km², DSIR encompasses 22 Gujarat villages and will be developed by the government-constituted body Dholera Special Investment Regional Development Authority (DSIRDA).
It is well-connected by road, rail, airport and seaport and lies close to the megacities of Gujarat, including Ahmedabad, Bhavnagar and Vadodara.
The site has a high coastal vulnerability index as it is situated in a low-lying area at the delta of five rivers, Padaliyo, Lilka, Utavali, Sukhbhadar and Ker. It is an inter-tidal and highly eroding area with corrosive air.
Power transmission from Dholera solar park :
The power generated by the Dholera solar park will be transmitted through a 49km-long, 33kV underground cable network, including high and low-voltage lines. The cable network will be built across the park to transport the generated power from the solar panels to pooling substations and into a 33kV / 400kV substation.
The power will step-up twice from 33kV to 200kV at the pooling substation and then to 400kV at Power Grid Corporation of India Limited (PGCIL) grid substation. The substation and pooling station will be constructed at an elevated height to avoid flood damage.
GETCO will evacuate the power generated in phase one, while the power generated in phase two will be evacuated by POWERGRID.
Infrastructure Details :
Radio masts and towers will be installed for holding the telecommunication antennas that will provide integrated telecommunication services.
Canals will be developed to off-take water from the Narmada River to the power plant. An underground water pumping facility, ground service reservoir and water transmission pipeline will be constructed to distribute the water through the site.
Highlights of Dholera Solar Park
The solar park will cover a total area of 8,595ha, which has been divided into 11 blocks with 27 plots in each block.
Each plot will have 100MW, 160MW and 200MW capacity blocks
The modules will be mounted on fixed and grouted plain cement concrete (PCC) foundation and installed at a pedestal height between 380mm and 450mm due to the tidal and flood effect.
Solar photovoltaic modules based on poly-crystalline silicon technology will be installed at the solar park.
The silicon rubber edge sealing will protect and support the module.
The maximum module power rating will reach just under 280Wp, while the photoelectric conversion module efficiency will be more than 15%. The junction boxes will be made of thermoplastic.